OTP roundel Origin Technical Productions title
Temporary Structures FOH & Control structures

4m x 4m FOH / Control structures



OTP uses the widely acclaimed Layher scaffolding system to construct its 4m x 4m Front of House Control structure.


FOH 4m x 4m structure for festival stage. FOH 4m x 4m structure for festival stage. FOH 4m x 4m structure for festival stage. FOH 4m x 4m structure for festival stage.
FOH structures:
1/4: 4m x 4m structure for festival stage.
FOH structures:
2/4: 4m x 4m structure for festival stage.
FOH structures:
3/4: 4m x 4m structure for festival stage.
FOH structures:
4/4: 4m x 4m structure for festival stage.
Wyndham House, Lester Way, Wallingford, Oxfordshire OX10 9TD
Yard access from Lupton Road, OX10 9BS
Production & Hire Telephone: +44(0)1235 816497
© Origin Technical Productions Ltd
Tuesday 30th April 2024   5:32pm
Registered in England and Wales Company registration No.8297114
Product highlight banner
Website design,
build & hosting.
HTML5 validation icon CSS validation icon